05 Oct KASTAMONU ENTEGRE A.S. POWER PLANT Posted at 13:07h in Uncategorized by abadmin 0 Comments 0 Likes Within the scope of Balıkesir Facility 100 MW Power Plant Investment; A total of 1200 tons of steel construction, mechanical manufacturing, and assembly works are carried out by us.
Sorry, the comment form is closed at this time.